Discover your dream home in this exquisite 5 bedroom, 4.5 bathroom residence located in prestigious Spring Chase subdivision. Thoughtfully updated and freshly painted inside and out. Step inside to an elegant dining room on your left and a versatile home office on your right. The spacious master bedroom, with stunning views of the covered patio and pool, features a luxurious master bath with built in closets, a separate shower, and a jetted tub.
The chef's kitchen showcases repainted cabinets, under cabinet lighting, and opens seamlessly to a cozy breakfast area and an oversized great room, complete with a gas fireplace (needs connection). Enjoy the convenience of a downstairs guest bedroom and bathroom, along with a laundry room abundant in storage. Upstairs, you'll find three more generous bedrooms and two additional bathrooms.
Outside, the property boasts a 3 car garage and a paved driveway. The beautifully landscaped backyard features a covered patio that leads to a heated 32x16 saltwater pool complete with a movie screen, just add your projector and you will be ready for many hours of entertainment, all under a screen enclosure. Don't miss the chance to make this stunning home yours!
****SELLER IS OFFERING A $10000.00 SELLERS CLOSING COST CREDIT****
Discover your dream home in this exquisite 5 bedroom, 4.5 bathroom residence located in prestigious Spring Chase subdivision. Thoughtfully updated and freshly painted inside and out. Step inside to an elegant dining room on your left and a versatile home office on your right. The spacious master bedroom, with stunning views of the covered patio and pool, features a luxurious master bath with built in closets, a separate shower, and a jetted tub.
The chef's kitchen showcases repainted cabinets, under cabinet lighting, and opens seamlessly to a cozy breakfast area and an oversized great room, complete with a gas fireplace (needs connection). Enjoy the convenience of a downstairs guest bedroom and bathroom, along with a laundry room abundant in storage. Upstairs, you'll find three more generous bedrooms and two additional bathrooms.
Outside, the property boasts a 3 car garage and a paved driveway. The beautifully landscaped backyard features a covered patio that leads to a heated 32x16 saltwater pool complete with a movie screen, just add your projector and you will be ready for many hours of entertainment, all under a screen enclosure. Don't miss the chance to make this stunning home yours!
****SELLER IS OFFERING A $10000.00 SELLERS CLOSING COST CREDIT****
Features
Building and Construction
Covered Spaces: 0.00
Exterior Features: Columns
Flooring: Hardwood, Tile
Living Area: 0.00
Land Information
Lot Features: Cleared, Landscaped, Subdivision, Paved
New Listings & Price Reduction Updates sent directly to your email
Create Your Own Property Search saved for your return visit.
"Like" Listings and Create a Favorites List
* NOTICE: By creating your free profile, you authorize us to send you periodic emails about new listings that match your saved searches and related real estate information.If you provide your telephone number, you are giving us permission to call you in response to this request, even if this phone number is in the State and/or National Do Not Call Registry.